# How does home battery installation work?

From survey to handover: find out what the installer does and what you prepare.

## The installation process step by step

Scheduling depends on your home and the chosen system. Explore the five steps and what you can prepare.

## How long does it take?

After the survey, discuss how much time mounting, connection and handover need. Ask for any additional work to be included in the schedule.

## What should you prepare?

Make the meter cupboard and mounting location accessible. Gather details of your existing setup and note your questions for the survey.

## 1. Site survey

At the survey, discuss the meter cupboard, mounting location, cable route and existing setup. Ask for a record of the work needed in your home.

## 2. Meter cupboard preparation

The installer assesses the preparation required. Agree whether meter cupboard work is needed and when it will be carried out.

## 3. Battery placement

The battery goes in the agreed location. Ask the installer to check mounting, access and clearance against the chosen model's requirements.

## 4. Inverter connection

The installer connects the chosen system. Discuss how it links to your existing setup and any power interruptions beforehand.

## 5. Testing and handover

At handover, discuss tests, operation and maintenance. Check which documents you receive and who to contact with questions or faults.

## Requirements and considerations

A safe installation starts with adequate space and a suitable meter cupboard. Your installer checks this during the survey.

## Space

Have the required clearance, ventilation and load-bearing capacity assessed for your chosen model.

## Meter cupboard

Ask the installer to assess whether your meter cupboard is suitable and what changes may be needed.

## Indoor or outdoor

Discuss indoor and outdoor locations at the survey. Use the manufacturer's requirements and site conditions as the starting point.

## Safety and agreements

Ask which requirements apply to your installation, who performs the work and which checks and documents are included at handover.

## Designed for your home

## Wall mounting

Keep enough clearance around the unit for safe ventilation and maintenance.

Your installer confirms the exact distances for your model during the survey.

## Garage placement

Floor-standing models need a flat, accessible spot with room to work around them.

Keep the area dry and clear of anything that blocks ventilation or service.

## Indoor utility room

Have your utility room or technical space assessed for the chosen system.

Discuss load-bearing capacity, dimensions and ventilation at the survey.

## Meter cupboard

Your installer checks whether there is room for an extra circuit or upgrade.

An older cupboard may need replacement or modification before installation.

## Meter cupboard upgrade

Discuss the changes your installer recommends for your meter cupboard.

Agree whether a separate visit is needed.

## Check and survey

Have the connection and preparation assessed at the survey.

You know in advance which changes are needed and what to expect.

## Agree on mounting

Have wall or floor fixings checked for your battery type.

Ask which clearance and ventilation the manufacturer specifies.

## Handover tests

Discuss which tests the installer performs before you start using the system.

Ask for an explanation and record of the test results.

## Guidance and documentation

Discuss which operating and maintenance guidance is included in handover.

Check which manuals, test results and agreements you receive.

## Know what your installation involves

Thuisaccu Installatie explains the process and, with your consent, forwards your consultation request to an installation partner.

## Frequently asked questions about home battery installation

### How is the installation schedule determined?

Discuss scheduling with the installation partner after the survey. Ask what preparation and materials are needed, how many visits are planned and when you need to be home. Have the agreed dates confirmed.

### How do I know if my meter cupboard needs changes?

Have the meter cupboard and connection assessed for the chosen system. Ask the installer what work is needed and why. Record the proposed changes and schedule before commissioning the work.

### What if additional meter cupboard work is identified on installation day?

Ask for an explanation of the additional work and its effect on cost and timing. Agree which tasks can proceed and what needs rescheduling. Have changes recorded before additional work is carried out.

## Ready to know what your installation involves?

Request a free consultation to discuss your situation and the installation process.